0118 970 1950
Your Koolkut will be supplied with the frame in flat-pack form in a substantial crate. This minimises the risk of damage in transit and keeps freight costs down. All components can be off-loaded manually and machines can even be sited in locations with restricted access.
Installation involves bolting up the frame and securing it firmly to the floor, in a level position before adding the column and saw head and setting up accurate alignment. All stages are set out in the user manual which is generously illustrated to help you clearly understand the installation process.
If you do not wish to carry out the installation work, Sagetech has a list of installation engineers who may be able to help you. Sagetech cannot, however be party to any contract between you and any installation engineer, and makes no recommendations.